KITSEN showcases integrated wall and slab formwork systems at bauma China
KITSEN used bauma China in Shanghai to present a coordinated wall, slab and perimeter safety system for high-rise construction. The company says the portfolio is designed to speed floor cycles, handle heavy concrete pressure and reduce jobsite labor on residential and commercial towers.
Why it matters: - High-rise builders need wall formwork, slab formwork and edge protection to work as one system. - KITSEN is positioning its portfolio as a way to shorten floor cycles, reduce equipment needs and improve site safety on tall residential and commercial projects. - The company says the integrated approach can reduce the risks that come with sourcing incompatible systems from multiple vendors.
What happened: - KITSEN unveiled its wall and slab formwork portfolio at bauma China in Shanghai. - The showcase centered on a unified monolithic pouring workflow for high-rise residential and commercial buildings. - KITSEN also presented its Protective Suspended Ringlock Scaffolding system as part of the same high-rise construction package.
The details: - KITSEN says it draws on more than 31 years of manufacturing and structural engineering experience. - The company evaluates its systems on four metrics: lateral concrete pressure resistance, floor cycle optimization, system standardization and component efficiency, and perimeter safety enclosure. - The K100 Wall Formwork System is rated for up to 60 kN/m2 of safe working load. - The K120 Wall Formwork System uses 15 mm AA-grade birch plywood panels. - The K120 system uses tie-rod spacing of up to 1.5 meters and panel sizes up to 900 x 3000 mm. - KITSEN says the K120 system can achieve assembly and dismantling yields of 90 to 110 m2 per worker-day. - The K100 system weighs an average of 23 kg/m2. - The K100 system uses articulated fixed and hinged corners for complex core walls, columns and tight shafts. - Both wall systems are engineered for up to 60 kN/m2 and are designed for zero-deflection performance under hydrostatic concrete pressure. - KITSEN says 6061-T6 aluminum frames can endure more than 300 cycles. - High-grade plywood panels can be inverted and reused 40 to 60 times. - The wall systems are designed to produce fair-faced concrete surfaces and avoid secondary plastering. - The Speedeck slab system uses four main components: panel, drophead, main beam and adjustable prop. - Speedeck panels weigh up to 15.33 kg each, allowing manual handling by one worker without a crane. - Speedeck uses powder-coated main beams and protected prop-head housings to reduce concrete buildup. - The system provides up to 3.45 m2 of coverage per prop and reduces prop density. - The Fastform system uses lightweight extruded aluminum frames with 10 mm birch plywood, plus filler beams, structural trusses and locking pins. - Fastform supports slab thickness up to 300 mm. - Fastform uses a 6-direction drophead locking mechanism. - KITSEN says Speedeck achieves 80 to 120 m2 per worker-day for assembly and 120 to 160 m2 per worker-day for stripping. - The company says the slab systems support 5-to-7-day structural floor cycles. - The Protective Suspended Ringlock Scaffolding system uses a continuous steel-mesh perimeter enclosure and ringlock node connections. - The scaffolding system anchors to cured concrete columns and floor slabs and is designed to self-climb with wall progress. - KITSEN says the scaffolding system is flame-retardant and built for fall protection and trade access at high elevations. - KITSEN says field performance records and case studies are included in its wall and decking formwork projects portfolio. - The company directs readers to more technical specifications and engineering data. - KITSEN also provides technical inquiries through its engineering sales team.
Between the lines: - The announcement is less about one product than a coordinated construction workflow. - KITSEN is trying to sell a single-engineered system that links wall pouring, slab stripping and perimeter protection. - The pitch suggests the company is targeting contractors that value speed, labor efficiency and reduced coordination risk.
What's next: - KITSEN is likely to use project case studies and technical inquiries to support sales after the bauma China showcase. - The company says it will continue to present field performance records through its projects portfolio. - Contractors evaluating high-rise formwork will likely compare cycle speed, component reuse and compatibility before choosing a system.
The bottom line: - KITSEN is marketing its wall, slab and safety systems as a single high-rise construction platform built for faster cycles, heavy load resistance and safer elevated work.
Disclaimer: This article was produced by AGP Wire with the assistance of artificial intelligence based on original source content and has been refined to improve clarity, structure, and readability. This content is provided on an “as is” basis. While care has been taken in its preparation, it may contain inaccuracies or omissions, and readers should consult the original source and independently verify key information where appropriate. This content is for informational purposes only and does not constitute legal, financial, investment, or other professional advice.
Sign up for:
China Arts & Entertainment Daily
The daily local news briefing you can trust. Every day. Subscribe now.
Check Your Email!
We sent a one-time activation link to: .
Confirm it's you by clicking the email link.
If the email is not in your inbox, check spam or try again.
Welcome back!
is already signed up. Check your inbox for updates.